Battlefield Drive Rehabilitation

This project was developed to renew aging sewer infrastructure and to address overflows by reducing the amount of rainfall that can enter the system through defects. It consists of the evaluation of approximately 33,250 linear feet of gravity sewer to determine necessary repairs by cured-in-place-pipe lining, service replacements by excavation, trenchless service renewals, manhole rehabilitation, and other miscellaneous sewer-related work.

The rehabilitation work will primarily occur in easements and public roadways. Construction methods will include trenchless technologies (pipe and manhole lining) to minimize excavation in streets and properties. However, some excavation will be necessary on certain streets, in existing easements, and in public rights-of-way for sewer service renewals to individual properties. Temporary piping for diversion pumping may be installed on the ground. Roadways and properties disturbed by the work will be restored to their original conditions as closely as possible in a manner that will ensure that MWS can maintain future access to the public sewer infrastructure.

Project Details

Project Type: Rehabilitation
Project Area Map: View Map
Metro Project #: 25SC0097
Council District(s): 18, 25
Sewer basin: Central
Designer: LDA Engineering
Contractor: TBD

Project Timeline

Phase Start Finish
Design July 2025 December 2025
Permitting/Bid/Award August 2025 April 2026
Construction April 2026 August 2027

Project Photos