Annual Rehabilitation - Ewing South

This project was identified to reduce wet-weather flows within the sewer system by addressing observed sources of infiltration and inflow through sewer rehabilitation. It also considers nearby sewers for inclusion in the project based on their condition, the likelihood of water migration to adjacent sewers, and the impact to customers. Work consists of the rehabilitation of approximately 3,340 linear feet of existing sewer lines by cured-in-place-pipe lining, and approximately 55 manholes will be rehabilitated. The project also entails extensive inspection, testing, and renewal of over 1000 service laterals, in addition to other miscellaneous sewer-related work.

Most of the rehabilitation work will occur in easements and public roadways. Construction methods will include trenchless technologies (pipe and manhole lining) to minimize excavation in streets and properties. However, some excavation will be necessary on certain streets, in existing easements, and in public rights-of-way for sewer service renewals to individual properties. Temporary piping for diversion pumping may be installed on the ground. Roadways and properties disturbed by the work will be restored to their original conditions as closely as possible in a manner that will ensure that MWS can maintain future access to the public sewer infrastructure.

Project Details

Project Type: Rehabilitation
Project Area Map: View Map
Metro Project #: 25SC0107
Council District(s): 1, 2, 3, 5, 7
Sewer basin: Annual Rehabilitation
Designer: CWN
Contractor: BLD Services, LLC.

Project Timeline

Phase Start Finish
Design December 2024 April 2025
Permitting/Bid/Award May 2025 March 2026
Construction March 2026 Febuary 2027