Cleanwater Nashville

Metro Water Services

Projects

Driftwood Equalization Facility

This project increased the storage capacity of the existing Driftwood facility by 3.2 million gallons and corrected operational electrical defects at the site. Through these improvements, the storage facility is now able to capture the additional flow generated from most rainfall events, preventing the release of combined sewage to the Cumberland River.

Project Details

Project Type: Equalization Facility

View map of project area

Metro Project #: 11-SC-0067

Council District(s): 19

Sewer basin: Central

Designer: Smith Seckman Reid, Inc.

Contractor: Haren Construction Co. Inc

Contact Us

Project Timeline

Phase Start Finish
Design August 2011 April 2012
Permitting/Bid/Award April 2012 July 2012
Construction July 2012 November 2013